The milling machine is equipped with a liquid additive system and spray bar. The system controls the amount of liquid added to the mix based on the volume of material being processed which is a product of milling depth and width and machine speed. The cutting width is normally 10.5 or 12.5 feet.
Water is also sprayed into the mixing chamber to help disperse the particles of asphalt around the milled material.
This process turns the brittle, aged asphalt into a sized, workable, homogenous mix. The mixed material is then conveyed to an asphalt paver where it is struck off at the desired depth and scope of the project design.
Cold-in-place recycling allows the recycled base to be shaped to build a cross-slope or adjust profiles to improve storm water run off ?a very important feature for Bethlehem Township, says Assistant Director Houck. It can also be worked to maintain super elevations, and it will improve ride and smoothness by taking out depressions and wheel rutting in the old pavement.
The CIR base is compacted immediately using a combination of 12-ton steel vibratory rollers and 25 to 30 ton pneumatic tired rollers.
Cold-in-place recycling causes little disruption to the traveling public and local businesses because traffic moves around the recycling train as it moves along the road. There are no trenches, drop-offs, or open cuts; the only excavation being done takes place underneath the milling machine.
Problem solving
Made up largely of very new roads and very old roads, most of Bethlehem Township抯 road renovation problems are best solved via cold-in-place recycling.
Simple overlays, used by many municipalities in the past to cover problem pavements, don抰 solve aging problems and create a buildup of blacktop that can create curb reveal and drainage problems.
Today抯 more popular tactics such as mill-and-fill ?milling off 2 to 4 inches of old pavement, and replacing it with new hot-mix asphalt ?and hot-in-place recycling don抰 correct deeper structural problems in the pavement.
With proper pre-construction testing and careful planning, cold in-place recycling can eliminate deep pavement weaknesses, lower the high blacktop crown of roads, and restore curb reveal to proper elevations. The recycling can re-profile the roadway, directing storm-water runoff into the curb lines where it is held and relayed into the municipal storm water system.
Bethlehem抯 process
Bethlehem Township has a blueprint for success with CIR projects.
The first step is preconstruction testing, which starts with core-testing the road to its full depth. Based on the thickness of the asphalt, the total depth of the aggregate, and whether or not the subbase material is viable, Bethlehem officials decide whether to use CIR or some other process to renovate the road.
When CIR is indicated, the township tests mix design formulations in the laboratory.
The final preconstruction step is analyzing the constructability of the project and engineering the lines and grade of the roadway. In this phase of the project, the township抯 road professionals perform a number of practical steps. They examine the roadway during bad weather to make sure any drainage problems are solved first. They check all utilities and obstructions and accommodate them in their plan of action. And they make sure the new elevations or cross slopes are correct for the safe passage of vehicular traffic.
Once construction begins, key factors include properly compacting the base course, allowing the proper cure period for it ? normally about two weeks ?then following up with a minimum 1.5-inch hot-mix asphalt overlay. Bethlehem has placed its own hot-mix wearing course for many years with great success. The hot-mix overlay can be placed up to two months after the cold-in-place recycling process has taken place.
In addition to creating a structurally stronger road at an economical cost, cold-in-place recycling has proven to be a customer-friendly tactic in Bethlehem Township抯 road program. It uses no heat, so no fumes are created in the process. It impedes very little on traffic. And it minimizes the amount of truck traffic needed to sustain the construction.
Keeping up with growth
Bethlehem Township has been one of the fastest growing communities in its county in recent years. Since 1990, the population has increased by 50%, swelling from 16,000 to 24,000. And the growth is not over. Along with a rash of new commercial and service buildings going up, an 800-home development has been proposed in the area.
To deal with the growing road demands of the area, the township抯 road professionals have invested in two very cost-effective pavement management strategies ?aggressive preventive maintenance for the new roads, and careful reconstruction with cold-in-place recycling for the aging ones. |